St George’s NHS Trust Hospital Case Study

June 2014: St George’s NHS Trust Hospital contract Mach Engineering (ME) to carry out water treatment on their space heating loops.

Bronte and Clare Wing were reported to have heating problems due to sludge and scale impeding water flow. System treatment started in June 2014 using Clean CT-01 that addressing all the problems of scale, fouling, corrosion and bacteria. System flow improved in just 3 months of treatment with filtration with space heating efficiency restored.

Three loops were further commissioned at Fountain Suite, Chest & Breast and Education system each with excellent results.

Please read Case Study report.

Comments are closed.